Main
About
Process
Gallery
Resume
Studio
Videos
Contact

Installation

 

 

 

The hollow concrete sections were brought to the site and the legs were stacked in their appropriate positions using a hand-cranked Roust-A-Bout.

Rebar was run from the foundation through the leg sections, creating reinforced columns that were then filled solid with concrete.

The upper halves were then assembled and remain hollow with reinforced metal skeletons inside.

Models & drawings
Armatures and clay
Plaster molds
Installation
Unveiling
Finished sculptures

More installation photos...

 


mail@simonscuplture.com
Main | Resources | Process | Gallery | Resume | Studio